Plant Consultancy Services

Selective Preoperative Services-

  • Strategic Recommendations for ethanol industry in support of long-term business viability.
  • Recommendations to proceed only if clear competitive advantages justify project continuance.

Core Services -

  1. Preparation of Feasibility Report from various feedstock.
  2. Detail techno-economic report.
  3. Entire Turn-Key Consultancy including marketing back-ups.
  4. Assistance in getting the requisite government licenses like, IEM, Letter Of Intent from Excise Department, Pollution Control Board (Consent to establish) etc.
  5. Detail Engineering for Process & Instrumentation Like
    • Detail Techno-Economic Feasibility
    • Basic Engineering services like Site key plan, Design basis, Process flow diagram, Mass and energy balance, Process and instrumentation diagram, Process Equipment specifications, drawings etc.
    • Utilities specification
    • Equipment foundation drawing
    • Electrical
    • Instrumentation and control
    • Plant operation and Maintenance manual
    • Monitoring Pilot Production to Commercial production.
  6. Sourcing of technology providers and arranging negotiations on client’s behalf.
  7. Assistance in technical Do’s and Don’ts in erecting the project.
  8. Developing of marketing information centers of the manufacturer.
  9. Providing liaisons from domestic as well as international market for raw material procurement.
  10. Member support through shared knowledge and benchmarking.

Environment Clearance From MoEF:

Assisting the industry in getting environmental clearance from MoEF. Scope of work :

  1. a) Screening/Fixation of Terms of Reference (TOR)
    1. i) Study of proposed location and its suitability w.r.t. distillery unit
    2. ii) Preparation of environmental management feasibility report
  • iii) Scoping of the EIA study for fixation of terms of reference
  1. iv) Making an application in accordance with Form-1
  2. v) Presentation to MoEF for TOR
  1. Environmental Impact Assessment Study
    1. i) Detailed study of the project process and its detailing
    2. ii) Monitoring of baseline data for ambient air quality, water quality, soil quality, noise quality etc. within 10 km. radius (as per TOR)
  • iii) Secondary data collection from various govt. agencies
  1. iv) Socio-economic survey of the study area
  2. v) Hydrological studies of the area
  3. vi) Satellite imageries from Govt. Department
  • vii) Scenario assessment – impact assessment and prediction
  • viii) Environmental management plan
  1. Preparation of EIA report
  2. Executive Summary of the EIA study (in English)
  3. Assisting the industry for Public Hearing – for carrying out the Public Hearing, representatives of the people would be educated regarding the latest technologies and would be physically shown the plants operational as per the latest technologies.
  4. Making presentations before MoEF for Environmental Clearance